SCS Weekly Upgrade/Maintenance Notification
June 12, 2013
For the most up-to-date information, view the SCS Operational Calendar.
Thursday, June 13, 2013 @ 06:00 - 13:00
IMPACT: No impact is anticipated.
CAUSE: Upgrade ios on the Elko Backbone MLX's to version 5.4c.
Friday, June 14, 2013
IMPACT: The following services on production Intel servers may be affected during the patch window:
- Active Directory file servers (NSHE INTAD and SCSD prod)
- Notes/Domino
CAUSE: SCS will manually apply routine operating system and security patches. (RFCA P20090501-01)
Friday, June 14, 2013 @ 06:00 - 07:00
IMPACT: There may be bumps for a few seconds while redundant links are brought back on line and the network re-converges.
CAUSE: To replace failed switch fabric module and place redundant links back in service.
Thursday, June 20, 2013 @ 06:00 - 07:00
IMPACT: There are no expected outages.
CAUSE: Upgrade LV ERP Devices: Upgrade LV ERP Loadbalancers to image code 12.400g, and upgrade LV ERP Firewall to image code 8.2(5)41.
Saturday, June 22, 2013 @ 12:01 - 24:00
IMPACT: Shared Instance Production iNtegrate will be unavailable.
CAUSE: Campus Solutions Bundle 29 will be applied to production. (PRFCA 2010110510-01)